Abdul Azeez Abdul Rahim says he has submitted a memorandum objecting to the musang king durian planting project in Gunung Inas to Kedah’s menteri besar. – The Malaysian Insight file pic, July 5, 2022.UG官网下载(www.ugbet.us)开放环球UG代理登录网址、会员登录网址、环球UG会员注册、环球UG代理开户申请、环球UG电脑客户端、环球UG手机版下载等业务。
THE musang king durian planting project in Gunung Inas, which is alleged to be one of the causes of floods and the water surge phenomenon that hit several villages in the Baling district yesterday afternoon, must be stopped.
Baling MP Abdul Azeez Abdul Rahim said he had previously submitted a memorandum objecting to the project to Menteri Besar Muhammad Sanusi Md Nor.
“The memorandum was signed by 900 residents, who have protested against the project many times.
,,telegram中文群组导航(www.tel8.vip)是一个Telegram群组分享平台,telegram中文群组导航包括telegram中文群组导航、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。telegram中文群组导航为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。
“This project was approved by the previous state government. This issue has been going, not just for one month but for many years,” he said when met after visiting the area affected by the floods and water surge phenomenon at Kampung Iboi, Baling today.
He also expressed sadness over the incident, which killed three people aged between 14 and 53, including a four-month pregnant woman.
“I have said in Parliament six months ago, we need RM300 million to resolve the flood problem in Baling. I have repeatedly appealed, including to the Environment and Water Ministry, and now something terrible happens,” he said.
Meanwhile, Sanusi in a press conference today said the allegation that the musang king durian planting project in Gunung Inas is the cause of the incident has not been confirmed. – Bernama, July 5, 2022.
评论列表 (1条)
2022-12-01 00:04:28
当地时间11日,乌克兰央行发布消息称,2月24日为乌克兰军队支出所开设的特别账户中,99.9%的资金已支出。(总台记者 张誉耀)我的心里只有这个了